MWPowerPlantFacts

Data last collected:

EIA plant 1787

Ingalls · Menominee · MI

Grand Rapids

Operated by Wisconsin Public Service Corp

Annual generation31,863 MWhSum of represented EIA-923 rows
Fuel codesWATCodes retained from EIA records
Grid contextMidcontinent Independent Transmission System Operator, Inc..Balancing authority or NERC region

Published location

Where is Grand Rapids?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

45.354700, -87.649400

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologyConventional Hydroelectric7.5 MW represented

Grouped from this plant’s represented generator records. Use the MI plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

11,998
22,803
33,245
43,402
54,150
63,713
72,970
81,928
91,188
101,397
112,792
122,277

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
11,998
22,803
33,245
43,402
54,150
63,713
72,970
81,928
91,188
101,397
112,792
122,277

2024 monthly net generation

MonthNet generation
11,998 MWh
22,803 MWh
33,245 MWh
43,402 MWh
54,150 MWh
63,713 MWh
72,970 MWh
81,928 MWh
91,188 MWh
101,397 MWh
112,792 MWh
122,277 MWh

Operating generators

IDTechnologyFuelMWStatus
4Conventional HydroelectricWAT1.9OP
5Conventional HydroelectricWAT1.9OP
3Conventional HydroelectricWAT1.5OS
1Conventional HydroelectricWAT1.1OP
2Conventional HydroelectricWAT1.1OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
1787
Sector
Electric Utility
Water source
Menominee River
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Grand Rapids power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Grand Rapids

Variation in the published months

Across 12 numeric monthly generation entries, 5 has the highest recorded value (4,150 MWh) and 9 the lowest (1,188 MWh). Their difference is 2,962 MWh. Missing months have not been treated as zero.

Reading the MW column

In the 5 numeric rows displayed in this table, MW ranges from 1.1 (1, 2) to 1.9 (4, 5). The difference is 0.8 in the column's stated units. This summary covers the displayed rows and retains the table's period and scope.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
1Conventional Hydroelectric1.11.11.10.1
2Conventional Hydroelectric1.11.11.10.1
3Conventional Hydroelectric1.51.51.50.1
4Conventional Hydroelectric1.91.91.91.6
5Conventional Hydroelectric1.91.91.90.2

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check