MWPowerPlantFacts
EIA plant 217

Balch Camp · Fresno · CA

Balch 1

Operated by Pacific Gas & Electric Co.

Annual generation138,842 MWhSum of represented EIA-923 rows
Fuel codesWATCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is Balch 1?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

36.909137, -119.087712

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
13,613 MWh
213,743 MWh
316,659 MWh
410,811 MWh
511,523 MWh
613,768 MWh
717,290 MWh
822,058 MWh
915,137 MWh
103,212 MWh
112,718 MWh
128,310 MWh

Operating generators

IDTechnologyFuelMWStatus
1Conventional HydroelectricWAT31OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
217
Sector
Electric Utility
Water source
North Fork Kings River
Data edition
2024-final