MWPowerPlantFacts
EIA plant 238

Pollock Pines · El Dorado · CA

El Dorado

Operated by El Dorado Irrigation District

Annual generation80,852 MWhSum of represented EIA-923 rows
Fuel codesWATCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is El Dorado?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

38.793574, -120.619152

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
111,551 MWh
210,647 MWh
312,289 MWh
412,457 MWh
512,322 MWh
610,690 MWh
71,758 MWh
82,783 MWh
92,138 MWh
10846 MWh
11-35 MWh
123,406 MWh

Operating generators

IDTechnologyFuelMWStatus
1Conventional HydroelectricWAT10OA
2Conventional HydroelectricWAT10OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
238
Sector
Electric Utility
Water source
South Fork American River
Data edition
2024-final