EIA plant 409

Snelling · Mariposa · CA

Exchequer

Operated by Merced Irrigation District

Annual generation267,905 MWhSum of represented EIA-923 rows
Fuel codesWATCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is Exchequer?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

37.584345, -120.268590

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologyConventional Hydroelectric94.5 MW represented

Grouped from this plant’s represented generator records. Use the CA plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

18,622
228,622
316,428
411,155
531,775
638,859
747,054
838,912
923,381
1018,490
111,366
123,241

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
18,622
228,622
316,428
411,155
531,775
638,859
747,054
838,912
923,381
1018,490
111,366
123,241

2024 monthly net generation

MonthNet generation
18,622 MWh
228,622 MWh
316,428 MWh
411,155 MWh
531,775 MWh
638,859 MWh
747,054 MWh
838,912 MWh
923,381 MWh
1018,490 MWh
111,366 MWh
123,241 MWh

Operating generators

IDTechnologyFuelMWStatus
1Conventional HydroelectricWAT94.5OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
409
Sector
IPP Non-CHP
Water source
Lake Mcclure-Merced River
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Exchequer power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Exchequer

Variation in the published months

Across 12 numeric monthly generation entries, 7 has the highest recorded value (47,054 MWh) and 11 the lowest (1,366 MWh). Their difference is 45,688 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
1Conventional Hydroelectric94.594.594.50.1

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check