MWPowerPlantFacts

Data last collected:

EIA plant 50037

Bakersfield · Kern · CA

Rio Bravo Hydro Project

Operated by Olcese Water District

Annual generation29,062 MWhSum of represented EIA-923 rows
Fuel codesWATCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is Rio Bravo Hydro Project?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

35.430000, -118.822200

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologyConventional Hydroelectric14 MW represented

Grouped from this plant’s represented generator records. Use the CA plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

1714
20
31,827
43,433
54,630
64,347
74,903
85,008
93,024
101,176
110
120

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
1714
20
31,827
43,433
54,630
64,347
74,903
85,008
93,024
101,176
110
120

2024 monthly net generation

MonthNet generation
1714 MWh
20 MWh
31,827 MWh
43,433 MWh
54,630 MWh
64,347 MWh
74,903 MWh
85,008 MWh
93,024 MWh
101,176 MWh
110 MWh
120 MWh

Operating generators

IDTechnologyFuelMWStatus
UNT1Conventional HydroelectricWAT7SB
UNT2Conventional HydroelectricWAT7SB

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
50037
Sector
IPP Non-CHP
Water source
Kern River
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Rio Bravo Hydro Project power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Rio Bravo Hydro Project

Variation in the published months

Across 12 numeric monthly generation entries, 8 has the highest recorded value (5,008 MWh) and 2, 11, 12 the lowest (0 MWh). Their difference is 5,008 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
UNT1Conventional Hydroelectric7.06.76.41.5
UNT2Conventional Hydroelectric7.06.76.41.5

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check