MWPowerPlantFacts

Data last collected:

EIA plant 50146

Port Wentworth · Chatham · GA

Imperial Savannah LP

Operated by US Sugar Savannah Refinery, LLC

Annual generation52,840 MWhSum of represented EIA-923 rows
Fuel codesNGCodes retained from EIA records
Grid contextSouthern Company Services, Inc. - TransBalancing authority or NERC region

Published location

Where is Imperial Savannah LP?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

32.143989, -81.146550

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologyNatural Gas Steam Turbine11.7 MW represented

Grouped from this plant’s represented generator records. Use the GA plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

13,398
23,995
34,646
44,041
54,898
65,078
74,461
84,902
94,542
104,004
114,504
124,371

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
13,398
23,995
34,646
44,041
54,898
65,078
74,461
84,902
94,542
104,004
114,504
124,371

2024 monthly net generation

MonthNet generation
13,398 MWh
23,995 MWh
34,646 MWh
44,041 MWh
54,898 MWh
65,078 MWh
74,461 MWh
84,902 MWh
94,542 MWh
104,004 MWh
114,504 MWh
124,371 MWh

Operating generators

IDTechnologyFuelMWStatus
GENDNatural Gas Steam TurbineNG5OP
GENBNatural Gas Steam TurbineNG3OP
GENANatural Gas Steam TurbineNG2.7OP
GENCNatural Gas Steam TurbineNG1OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
50146
Sector
Industrial CHP
Water source
Floridan Aquifer
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Imperial Savannah LP power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Imperial Savannah LP

Variation in the published months

Across 12 numeric monthly generation entries, 6 has the highest recorded value (5,078 MWh) and 1 the lowest (3,398 MWh). Their difference is 1,680 MWh. Missing months have not been treated as zero.

Reading the MW column

In the 4 numeric rows displayed in this table, MW ranges from 1 (GENC) to 5 (GEND). The difference is 4 in the column's stated units. This summary covers the displayed rows and retains the table's period and scope.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
GENANatural Gas Steam Turbine2.72.72.70.5
GENBNatural Gas Steam Turbine3.03.03.00.5
GENCNatural Gas Steam Turbine1.01.01.00.3
GENDNatural Gas Steam Turbine5.04.54.51.0

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.