PowerPlantFactsEvidence report · prepared 2 September 2026https://powerplantfacts.com/entity/50205
EIA plant 50205
Durango · La Plata · CO
Williams Ignacio Natural Gas Plant
Operated by Harvest Midstream Co
Published location
Where is Williams Ignacio Natural Gas Plant?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
37.145556, -107.784722
Open the interactive map ↗Map data © OpenStreetMap contributors
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | 3,720 MWh |
| 2 | 3,808 MWh |
| 3 | 4,092 MWh |
| 4 | 3,624 MWh |
| 5 | 4,161 MWh |
| 6 | 4,015 MWh |
| 7 | 4,286 MWh |
| 8 | 4,282 MWh |
| 9 | 3,888 MWh |
| 10 | 4,017 MWh |
| 11 | 4,104 MWh |
| 12 | 4,125 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| 7101 | All Other | WH | 6.1 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
EIA plant ID
50205
Sector
Industrial Non-CHP
Water source
Florida River
Data edition
2024-final