PowerPlantFactsEvidence report · prepared 2 September 2026https://powerplantfacts.com/entity/50352
EIA plant 50352
Bradley · San Luis Obispo · CA
Nacimiento Hydro Project
Operated by Monterey Cnty Water Res Agency
Published location
Where is Nacimiento Hydro Project?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
35.798576, -120.883331
Open the interactive map ↗Map data © OpenStreetMap contributors
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | 119 MWh |
| 2 | 119 MWh |
| 3 | 1,879 MWh |
| 4 | 2,145 MWh |
| 5 | 2,875 MWh |
| 6 | 2,600 MWh |
| 7 | 2,808 MWh |
| 8 | 2,758 MWh |
| 9 | 2,313 MWh |
| 10 | 254 MWh |
| 11 | 173 MWh |
| 12 | 181 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| 1 | Conventional Hydroelectric | WAT | 4 | OP |
| 2 | Conventional Hydroelectric | WAT | 0.4 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
EIA plant ID
50352
Sector
IPP Non-CHP
Water source
Nacimiento Reservoir
Data edition
2024-final