MWPowerPlantFacts
EIA plant 54723

Lorton · Fairfax · VA

I 95 Landfill Phase II

Operated by NextEra Renewable Fuels, LLC

Annual generation19,327 MWhSum of represented EIA-923 rows
Fuel codesLFGCodes retained from EIA records
Grid contextPJM Interconnection, LLCBalancing authority or NERC region

Published location

Where is I 95 Landfill Phase II?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

38.689200, -77.237500

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
11,785 MWh
21,724 MWh
31,670 MWh
41,754 MWh
51,794 MWh
61,642 MWh
71,432 MWh
81,620 MWh
91,467 MWh
101,564 MWh
111,248 MWh
121,628 MWh

Operating generators

IDTechnologyFuelMWStatus
UNT1Landfill GasLFG0.8OP
UNT2Landfill GasLFG0.8OP
UNT3Landfill GasLFG0.8OP
UNT4Landfill GasLFG0.8OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
54723
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final