MWPowerPlantFacts
EIA plant 54749

Escondido · San Diego · CA

Goal Line LP

Operated by Goal Line LP

Annual generation11,365 MWhSum of represented EIA-923 rows
Fuel codesNGCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is Goal Line LP?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

33.118500, -117.099500

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
1831 MWh
20 MWh
316 MWh
40 MWh
50 MWh
60 MWh
74,207 MWh
82,498 MWh
92,928 MWh
10579 MWh
11306 MWh
120 MWh

Operating generators

IDTechnologyFuelMWStatus
CTGNatural Gas Fired Combined CycleNG41.2OP
STGNatural Gas Fired Combined CycleNG10.2OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
54749
Sector
IPP CHP
Water source
Municipality
Data edition
2024-final