MWPowerPlantFacts

Data last collected:

EIA plant 54812

Eden · Jerome · ID

Mile 28 Water Power Project

Operated by Wood Hydro, LLC

Annual generation5,300 MWhSum of represented EIA-923 rows
Fuel codesWATCodes retained from EIA records
Grid contextIdaho Power CompanyBalancing authority or NERC region

Published location

Where is Mile 28 Water Power Project?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

42.740139, -114.161173

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologyConventional Hydroelectric1.4 MW represented

Grouped from this plant’s represented generator records. Use the ID plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

10
20
30
4676
5958
6920
7939
8531
9742
10205
11318
1211

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
10
20
30
4676
5958
6920
7939
8531
9742
10205
11318
1211

2024 monthly net generation

MonthNet generation
10 MWh
20 MWh
30 MWh
4676 MWh
5958 MWh
6920 MWh
7939 MWh
8531 MWh
9742 MWh
10205 MWh
11318 MWh
1211 MWh

Operating generators

IDTechnologyFuelMWStatus
1Conventional HydroelectricWAT0.7OP
2Conventional HydroelectricWAT0.7OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
54812
Sector
IPP Non-CHP
Water source
Milner- Cooling Canal
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Mile 28 Water Power Project power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Mile 28 Water Power Project

Variation in the published months

Across 12 numeric monthly generation entries, 5 has the highest recorded value (958 MWh) and 1, 2, 3 the lowest (0 MWh). Their difference is 958 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
1Conventional Hydroelectric0.70.70.60.3
2Conventional Hydroelectric0.70.70.60.3

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check