MWPowerPlantFacts

Data last collected:

EIA plant 55166

Gaffney · Cherokee · SC

Broad River Energy Center

Operated by Broad River Energy LLC

Annual generation523,785 MWhSum of represented EIA-923 rows
Fuel codesNGCodes retained from EIA records
Grid contextDuke Energy CarolinasBalancing authority or NERC region

Published location

Where is Broad River Energy Center?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

35.078600, -81.575000

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologyNatural Gas Fired Combustion Turbine985 MW represented

Grouped from this plant’s represented generator records. Use the SC plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

17,241
29,386
315,653
444,120
524,908
658,621
7118,250
8115,545
955,944
1024,751
1139,710
129,656

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
17,241
29,386
315,653
444,120
524,908
658,621
7118,250
8115,545
955,944
1024,751
1139,710
129,656

2024 monthly net generation

MonthNet generation
17,241 MWh
29,386 MWh
315,653 MWh
444,120 MWh
524,908 MWh
658,621 MWh
7118,250 MWh
8115,545 MWh
955,944 MWh
1024,751 MWh
1139,710 MWh
129,656 MWh

Operating generators

IDTechnologyFuelMWStatus
CT01Natural Gas Fired Combustion TurbineNG197OP
CT02Natural Gas Fired Combustion TurbineNG197OP
CT03Natural Gas Fired Combustion TurbineNG197OP
CT04Natural Gas Fired Combustion TurbineNG197OP
CT05Natural Gas Fired Combustion TurbineNG197OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
55166
Sector
IPP Non-CHP
Water source
Municipality
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Broad River Energy Center power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Broad River Energy Center

Variation in the published months

Across 12 numeric monthly generation entries, 7 has the highest recorded value (118,250 MWh) and 1 the lowest (7,241 MWh). Their difference is 111,009 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
CT01Natural Gas Fired Combustion Turbine197.0175.85177.05100.0
CT02Natural Gas Fired Combustion Turbine197.0173.0174.93100.0
CT03Natural Gas Fired Combustion Turbine197.0173.95175.8100.0
CT04Natural Gas Fired Combustion Turbine197.0172.23172.19100.0
CT05Natural Gas Fired Combustion Turbine197.0171.36172.44100.0

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check