MWPowerPlantFacts
EIA plant 55276

Huntington · Wayne · WV

Ceredo Generating Station

Operated by Appalachian Power Co

Annual generation492,386 MWhSum of represented EIA-923 rows
Fuel codesNGCodes retained from EIA records
Grid contextPJM Interconnection, LLCBalancing authority or NERC region

Published location

Where is Ceredo Generating Station?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

38.368100, -82.533900

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
117,545 MWh
27,042 MWh
310,631 MWh
411,787 MWh
520,534 MWh
645,230 MWh
752,789 MWh
826,497 MWh
945,969 MWh
1074,199 MWh
11148,599 MWh
1231,564 MWh

Operating generators

IDTechnologyFuelMWStatus
01Natural Gas Fired Combustion TurbineNG86.5OP
02Natural Gas Fired Combustion TurbineNG86.5OP
03Natural Gas Fired Combustion TurbineNG86.5OP
04Natural Gas Fired Combustion TurbineNG86.5OP
05Natural Gas Fired Combustion TurbineNG86.5OP
06Natural Gas Fired Combustion TurbineNG86.5OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
55276
Sector
Electric Utility
Water source
City of Kenova
Data edition
2024-final