MWPowerPlantFacts

Data last collected:

EIA plant 55510

San Diego · San Diego · CA

Border Hybrid Energy Center

Operated by CalPeak Power, LLC

Annual generation14,804 MWhSum of represented EIA-923 rows
Fuel codesNGCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is Border Hybrid Energy Center?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

32.562448, -116.943869

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologyNatural Gas Fired Combustion Turbine60.5 MW represented

Grouped from this plant’s represented generator records. Use the CA plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

1337.92
2251.42
338.72
462.48
523.27
6679.1
73,483.15
82,468.76
93,249.76
102,873.7
111,179.12
12156.6

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
1337.92
2251.42
338.72
462.48
523.27
6679.1
73,483.15
82,468.76
93,249.76
102,873.7
111,179.12
12156.6

2024 monthly net generation

MonthNet generation
1338 MWh
2251 MWh
339 MWh
462 MWh
523 MWh
6679 MWh
73,483 MWh
82,469 MWh
93,250 MWh
102,874 MWh
111,179 MWh
12157 MWh

Operating generators

IDTechnologyFuelMWStatus
CPP4Natural Gas Fired Combustion TurbineNG60.5OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
55510
Sector
IPP Non-CHP
Water source
Municipality
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Border Hybrid Energy Center power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Border Hybrid Energy Center

Variation in the published months

Across 12 numeric monthly generation entries, 7 has the highest recorded value (3,483 MWh) and 5 the lowest (23 MWh). Their difference is 3,460 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
CPP4Natural Gas Fired Combustion Turbine60.548.051.321.0

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check