MWPowerPlantFacts

Data last collected:

EIA plant 56813

Fresno · Fresno · CA

CSU Fresno Solar Project

Operated by MMA Fresno Power LP

Annual generation1,438 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is CSU Fresno Solar Project?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

36.809841, -119.741665

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic1 MW represented

Grouped from this plant’s represented generator records. Use the CA plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

152
275
3143
4196
5224
6170
7160
8150
9106
1070
1153
1239

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
152
275
3143
4196
5224
6170
7160
8150
9106
1070
1153
1239

2024 monthly net generation

MonthNet generation
152 MWh
275 MWh
3143 MWh
4196 MWh
5224 MWh
6170 MWh
7160 MWh
8150 MWh
9106 MWh
1070 MWh
1153 MWh
1239 MWh

Operating generators

IDTechnologyFuelMWStatus
1Solar PhotovoltaicSUN0.5OP
2Solar PhotovoltaicSUN0.5OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
56813
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right CSU Fresno Solar Project power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at CSU Fresno Solar Project

Variation in the published months

Across 12 numeric monthly generation entries, 5 has the highest recorded value (224 MWh) and 12 the lowest (39 MWh). Their difference is 185 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
1Solar Photovoltaic0.50.50.5Not supplied
2Solar Photovoltaic0.50.50.5Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check