PowerPlantFactsEvidence report · prepared 2 September 2026https://powerplantfacts.com/entity/56961
EIA plant 56961
Goldsmith · Ector · TX
Notrees Windpower Hybrid
Operated by Duke Energy Renewables Services
Published location
Where is Notrees Windpower Hybrid?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
31.995000, -102.828333
Open the interactive map ↗Map data © OpenStreetMap contributors
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | 16,997 MWh |
| 2 | 24,840 MWh |
| 3 | 21,198 MWh |
| 4 | 18,054 MWh |
| 5 | 23,509 MWh |
| 6 | 23,217 MWh |
| 7 | 14,297 MWh |
| 8 | 19,512 MWh |
| 9 | 22,570 MWh |
| 10 | 28,499 MWh |
| 11 | 25,488 MWh |
| 12 | 22,361 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| VESTA | Onshore Wind Turbine | WND | 92.5 | OP |
| GE | Onshore Wind Turbine | WND | 60 | OP |
| BATT | Batteries | MWH | 36 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
EIA plant ID
56961
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final