MWPowerPlantFacts
EIA plant 56961

Goldsmith · Ector · TX

Notrees Windpower Hybrid

Operated by Duke Energy Renewables Services

Annual generation260,542 MWhSum of represented EIA-923 rows
Fuel codesMWH, WNDCodes retained from EIA records
Grid contextElectric Reliability Council of Texas, Inc.Balancing authority or NERC region

Published location

Where is Notrees Windpower Hybrid?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

31.995000, -102.828333

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
116,997 MWh
224,840 MWh
321,198 MWh
418,054 MWh
523,509 MWh
623,217 MWh
714,297 MWh
819,512 MWh
922,570 MWh
1028,499 MWh
1125,488 MWh
1222,361 MWh

Operating generators

IDTechnologyFuelMWStatus
VESTAOnshore Wind TurbineWND92.5OP
GEOnshore Wind TurbineWND60OP
BATTBatteriesMWH36OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
56961
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final