MWPowerPlantFacts

Data last collected:

EIA plant 56961

Goldsmith · Ector · TX

Notrees Windpower Hybrid

Operated by Duke Energy Renewables Services

Annual generation260,542 MWhSum of represented EIA-923 rows
Fuel codesMWH, WNDCodes retained from EIA records
Grid contextElectric Reliability Council of Texas, Inc.Balancing authority or NERC region

Published location

Where is Notrees Windpower Hybrid?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

31.995000, -102.828333

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologyOnshore Wind Turbine152.5 MW represented
TechnologyBatteries36 MW represented

Grouped from this plant’s represented generator records. Use the TX plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

116,997
224,840
321,198
418,054
523,509
623,217
714,297
819,512
922,570
1028,499
1125,488
1222,361

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
116,997
224,840
321,198
418,054
523,509
623,217
714,297
819,512
922,570
1028,499
1125,488
1222,361

2024 monthly net generation

MonthNet generation
116,997 MWh
224,840 MWh
321,198 MWh
418,054 MWh
523,509 MWh
623,217 MWh
714,297 MWh
819,512 MWh
922,570 MWh
1028,499 MWh
1125,488 MWh
1222,361 MWh

Operating generators

IDTechnologyFuelMWStatus
VESTAOnshore Wind TurbineWND92.5OP
GEOnshore Wind TurbineWND60OP
BATTBatteriesMWH36OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
56961
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Notrees Windpower Hybrid power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Notrees Windpower Hybrid

Variation in the published months

Across 12 numeric monthly generation entries, 10 has the highest recorded value (28,499 MWh) and 7 the lowest (14,297 MWh). Their difference is 14,202 MWh. Missing months have not been treated as zero.

Reading the MW column

In the 3 numeric rows displayed in this table, MW ranges from 36 (BATT) to 92.5 (VESTA). The difference is 56.5 in the column's stated units. This summary covers the displayed rows and retains the table's period and scope.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
BATTBatteries36.036.036.00.0
GEOnshore Wind Turbine60.060.060.00.1
VESTAOnshore Wind Turbine92.592.592.50.1

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check