MWPowerPlantFacts
EIA plant 57127

Rialto · San Bernardino · CA

Solar Photovoltaic Project #24

Operated by Southern California Edison Co

Annual generation0 MWhSum of represented EIA-923 rows
Fuel codesUnavailableCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is Solar Photovoltaic Project #24?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

34.038333, -117.373055

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Operating generators

IDTechnologyFuelMWStatus

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
57127
Sector
Electric Utility
Water source
Unavailable
Data edition
2024-final