EIA plant 57198
Hartland · Freeborn · MN
Bent Tree Wind Farm Phase 1
Operated by Wisconsin Power & Light Co
Published location
Where is Bent Tree Wind Farm Phase 1?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
43.724596, -93.450429
Open the interactive map ↗Map data © OpenStreetMap contributors
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | 30,119 MWh |
| 2 | 34,959 MWh |
| 3 | 28,515 MWh |
| 4 | 28,158 MWh |
| 5 | 27,688 MWh |
| 6 | 27,695 MWh |
| 7 | 18,517 MWh |
| 8 | 20,752 MWh |
| 9 | 24,245 MWh |
| 10 | 33,311 MWh |
| 11 | 29,661 MWh |
| 12 | 39,375 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | WND | 201.3 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
EIA plant ID
57198
Sector
Electric Utility
Water source
Unavailable
Data edition
2024-final