MWPowerPlantFacts

Data last collected:

EIA plant 57204

Hackettstown · Warren · NJ

PSEG Hackettstown

Operated by PSEG Solar Hackettstown LLC

Annual generation1,761 MWhSum of represented EIA-923 rows
Fuel codesUnavailableCodes retained from EIA records
Grid contextPJM Interconnection, LLCBalancing authority or NERC region

Published location

Where is PSEG Hackettstown?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

40.860629, -74.822935

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

171
2155
3206
4205
5251
6232
7234
8258
9149
100
110
120

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
171
2155
3206
4205
5251
6232
7234
8258
9149
100
110
120

2024 monthly net generation

MonthNet generation
171 MWh
2155 MWh
3206 MWh
4205 MWh
5251 MWh
6232 MWh
7234 MWh
8258 MWh
9149 MWh
100 MWh
110 MWh
120 MWh

Operating generators

IDTechnologyFuelMWStatus

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
57204
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right PSEG Hackettstown power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at PSEG Hackettstown

Variation in the published months

Across 12 numeric monthly generation entries, 8 has the highest recorded value (258 MWh) and 10, 11, 12 the lowest (0 MWh). Their difference is 258 MWh. Missing months have not been treated as zero.