MWPowerPlantFacts
EIA plant 57441

Tulare · Tulare · CA

Solar Photovoltaic Project #42

Operated by Southern California Edison Co

Annual generation7,575 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is Solar Photovoltaic Project #42?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

36.028056, -119.074722

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
1412 MWh
2222 MWh
3684 MWh
4903 MWh
51,050 MWh
6936 MWh
7821 MWh
8699 MWh
9602 MWh
10463 MWh
11424 MWh
12359 MWh

Operating generators

IDTechnologyFuelMWStatus
S42ASolar PhotovoltaicSUN0.5OP
S42BSolar PhotovoltaicSUN0.5OP
S42CSolar PhotovoltaicSUN0.5OP
S42DSolar PhotovoltaicSUN0.5OP
S42ESolar PhotovoltaicSUN0.5OP
S42FSolar PhotovoltaicSUN0.5OP
S42GSolar PhotovoltaicSUN0.5OP
S42HSolar PhotovoltaicSUN0.5OP
S42ISolar PhotovoltaicSUN0.5OP
S42JSolar PhotovoltaicSUN0.5OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
57441
Sector
Electric Utility
Water source
Unavailable
Data edition
2024-final