PowerPlantFactsEvidence report · prepared 2 September 2026https://powerplantfacts.com/entity/57659
EIA plant 57659
Manor · Travis · TX
East Blackland Solar Project 1
Operated by Duke Energy Renewables Services
Published location
Where is East Blackland Solar Project 1?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
30.421400, -97.461400
Open the interactive map ↗Map data © OpenStreetMap contributors
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | 15,714 MWh |
| 2 | 21,269 MWh |
| 3 | 19,737 MWh |
| 4 | 22,071 MWh |
| 5 | 24,080 MWh |
| 6 | 31,137 MWh |
| 7 | 31,401 MWh |
| 8 | 31,302 MWh |
| 9 | 25,475 MWh |
| 10 | 23,751 MWh |
| 11 | 16,609 MWh |
| 12 | 9,350 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| PSF | Solar Photovoltaic | SUN | 144 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
EIA plant ID
57659
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final