MWPowerPlantFacts
EIA plant 57881

Williston · Williams · ND

Pioneer Generation Station

Operated by Basin Electric Power Coop

Annual generation1,092,231 MWhSum of represented EIA-923 rows
Fuel codesNGCodes retained from EIA records
Grid contextSouthwest Power PoolBalancing authority or NERC region

Published location

Where is Pioneer Generation Station?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

48.232500, -103.952780

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
1101,872 MWh
282,179 MWh
368,856 MWh
452,236 MWh
583,551 MWh
695,592 MWh
7147,305 MWh
8140,807 MWh
992,690 MWh
1061,219 MWh
1178,023 MWh
1287,899 MWh

Operating generators

IDTechnologyFuelMWStatus
01Natural Gas Fired Combustion TurbineNG60.5OP
02Natural Gas Fired Combustion TurbineNG60.5OP
03Natural Gas Fired Combustion TurbineNG60.5OP
11Natural Gas Internal Combustion EngineNG9.3OP
12Natural Gas Internal Combustion EngineNG9.3OP
13Natural Gas Internal Combustion EngineNG9.3OP
14Natural Gas Internal Combustion EngineNG9.3OP
15Natural Gas Internal Combustion EngineNG9.3OP
16Natural Gas Internal Combustion EngineNG9.3OP
17Natural Gas Internal Combustion EngineNG9.3OP
18Natural Gas Internal Combustion EngineNG9.3OP
19Natural Gas Internal Combustion EngineNG9.3OP
20Natural Gas Internal Combustion EngineNG9.3OP
21Natural Gas Internal Combustion EngineNG9.3OP
22Natural Gas Internal Combustion EngineNG9.3OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
57881
Sector
Electric Utility
Water source
Unavailable
Data edition
2024-final