MWPowerPlantFacts

Data last collected:

EIA plant 57882

Aurora · Clackamas · OR

Baldock Solar Highway

Operated by Portland General Electric Co

Annual generation1,279 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextPortland General Electric CompanyBalancing authority or NERC region

Published location

Where is Baldock Solar Highway?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

45.269444, -122.771667

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic1.4 MW represented

Grouped from this plant’s represented generator records. Use the OR plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

130
263
3108
4112
5195
6192
7186
8154
9125
1072
1126
1216

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
130
263
3108
4112
5195
6192
7186
8154
9125
1072
1126
1216

2024 monthly net generation

MonthNet generation
130 MWh
263 MWh
3108 MWh
4112 MWh
5195 MWh
6192 MWh
7186 MWh
8154 MWh
9125 MWh
1072 MWh
1126 MWh
1216 MWh

Operating generators

IDTechnologyFuelMWStatus
BSH1Solar PhotovoltaicSUN1.4OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
57882
Sector
Electric Utility
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Baldock Solar Highway power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Baldock Solar Highway

Variation in the published months

Across 12 numeric monthly generation entries, 5 has the highest recorded value (195 MWh) and 12 the lowest (16 MWh). Their difference is 179 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
BSH1Solar Photovoltaic1.41.41.4Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check