MWPowerPlantFacts
EIA plant 58113

Cabazon · Riverside · CA

Foundation RRM

Operated by Foundation CA Fund V Manager, LLC

Annual generation8,885 MWhSum of represented EIA-923 rows
Fuel codesWNDCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is Foundation RRM?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

33.917222, -116.815000

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
1404 MWh
2482 MWh
3803 MWh
4803 MWh
51,169 MWh
61,193 MWh
7896 MWh
8815 MWh
9694 MWh
10565 MWh
11526 MWh
12535 MWh

Operating generators

IDTechnologyFuelMWStatus
WTG1Onshore Wind TurbineWND1OP
WTG2Onshore Wind TurbineWND1OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
58113
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final