MWPowerPlantFacts

Data last collected:

EIA plant 58363

Panhandle · Carson · TX

Majestic II Wind

Operated by NextEra Energy Majestic Wind

Annual generation157,406 MWhSum of represented EIA-923 rows
Fuel codesWNDCodes retained from EIA records
Grid contextSouthwest Power PoolBalancing authority or NERC region

Published location

Where is Majestic II Wind?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

35.386038, -101.578572

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologyOnshore Wind Turbine79.6 MW represented

Grouped from this plant’s represented generator records. Use the TX plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

113,175
213,877
39,706
48,039
513,066
616,268
715,023
817,196
913,619
1011,270
1111,742
1214,425

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
113,175
213,877
39,706
48,039
513,066
616,268
715,023
817,196
913,619
1011,270
1111,742
1214,425

2024 monthly net generation

MonthNet generation
113,175 MWh
213,877 MWh
39,706 MWh
48,039 MWh
513,066 MWh
616,268 MWh
715,023 MWh
817,196 MWh
913,619 MWh
1011,270 MWh
1111,742 MWh
1214,425 MWh

Operating generators

IDTechnologyFuelMWStatus
WND1Onshore Wind TurbineWND79.6OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
58363
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Majestic II Wind power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Majestic II Wind

Variation in the published months

Across 12 numeric monthly generation entries, 8 has the highest recorded value (17,196 MWh) and 4 the lowest (8,039 MWh). Their difference is 9,157 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
WND1Onshore Wind Turbine79.679.679.64.0

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check