MWPowerPlantFacts

Data last collected:

EIA plant 58383

Hyder · Yuma · AZ

Hyder II Hybrid

Operated by Arizona Public Service Co

Annual generation32,538 MWhSum of represented EIA-923 rows
Fuel codesMWH, SUNCodes retained from EIA records
Grid contextArizona Public Service CompanyBalancing authority or NERC region

Published location

Where is Hyder II Hybrid?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

33.027000, -113.348900

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologyBatteries14 MW represented
TechnologySolar Photovoltaic14 MW represented

Grouped from this plant’s represented generator records. Use the AZ plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

11,833
22,021
32,746
43,188
53,511
63,486
73,016
83,336
93,266
102,807
112,086
121,242

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
11,833
22,021
32,746
43,188
53,511
63,486
73,016
83,336
93,266
102,807
112,086
121,242

2024 monthly net generation

MonthNet generation
11,833 MWh
22,021 MWh
32,746 MWh
43,188 MWh
53,511 MWh
63,486 MWh
73,016 MWh
83,336 MWh
93,266 MWh
102,807 MWh
112,086 MWh
121,242 MWh

Operating generators

IDTechnologyFuelMWStatus
H214MBatteriesMWH14OP
PV1Solar PhotovoltaicSUN14OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
58383
Sector
Electric Utility
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Hyder II Hybrid power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Hyder II Hybrid

Variation in the published months

Across 12 numeric monthly generation entries, 5 has the highest recorded value (3,511 MWh) and 12 the lowest (1,242 MWh). Their difference is 2,269 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
H214MBatteries14.014.014.0Not supplied
PV1Solar Photovoltaic14.014.014.0Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check