EIA plant 58430

Calexico · Imperial · CA

Centinela Solar Energy

Operated by Arevon Energy, Inc.

Annual generation352,741 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is Centinela Solar Energy?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

32.686944, -115.647778

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
120,900 MWh
223,010 MWh
326,142 MWh
428,347 MWh
535,620 MWh
640,368 MWh
737,852 MWh
836,059 MWh
933,248 MWh
1028,636 MWh
1122,748 MWh
1219,811 MWh

Operating generators

IDTechnologyFuelMWStatus
CSE1Solar PhotovoltaicSUN34.2OP
CSE3Solar PhotovoltaicSUN34.2OP
CSE4Solar PhotovoltaicSUN34.2OP
CSE2Solar PhotovoltaicSUN26.6OP
CSE6Solar PhotovoltaicSUN26.6OP
CSE5Solar PhotovoltaicSUN19OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
58430
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final