MWPowerPlantFacts

Data last collected:

EIA plant 58455

Culver · Jefferson · OR

45 Mile Hydroelectric Project

Operated by EBD Hydro LLC

Annual generation4,936 MWhSum of represented EIA-923 rows
Fuel codesWATCodes retained from EIA records
Grid contextPacifiCorp - WestBalancing authority or NERC region

Published location

Where is 45 Mile Hydroelectric Project?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

44.528056, -121.152778

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologyConventional Hydroelectric3 MW represented

Grouped from this plant’s represented generator records. Use the OR plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

10
20
30
4403
5797
6883
7886
8778
9880
10309
110
120

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
10
20
30
4403
5797
6883
7886
8778
9880
10309
110
120

2024 monthly net generation

MonthNet generation
10 MWh
20 MWh
30 MWh
4403 MWh
5797 MWh
6883 MWh
7886 MWh
8778 MWh
9880 MWh
10309 MWh
110 MWh
120 MWh

Operating generators

IDTechnologyFuelMWStatus
0001Conventional HydroelectricWAT1OP
0002Conventional HydroelectricWAT1OP
0003Conventional HydroelectricWAT1OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
58455
Sector
IPP Non-CHP
Water source
North Unit Main Canal
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right 45 Mile Hydroelectric Project power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at 45 Mile Hydroelectric Project

Variation in the published months

Across 12 numeric monthly generation entries, 7 has the highest recorded value (886 MWh) and 1, 2, 3, 11, 12 the lowest (0 MWh). Their difference is 886 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
0001Conventional Hydroelectric1.01.01.00.9
0002Conventional Hydroelectric1.01.01.00.9
0003Conventional Hydroelectric1.01.01.00.9

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check