MWPowerPlantFacts

Data last collected:

EIA plant 58479

Roswell · Chaves · NM

SEV NM Phase 2

Operated by Altus Power America Management, LLC

Annual generation4,213 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextSouthwest Power PoolBalancing authority or NERC region

Published location

Where is SEV NM Phase 2?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

33.351111, -104.506944

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic2 MW represented

Grouped from this plant’s represented generator records. Use the NM plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

1302
2304
3354
4391
5419
6360
7390
8376
9356
10366
11305
12290

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
1302
2304
3354
4391
5419
6360
7390
8376
9356
10366
11305
12290

2024 monthly net generation

MonthNet generation
1302 MWh
2304 MWh
3354 MWh
4391 MWh
5419 MWh
6360 MWh
7390 MWh
8376 MWh
9356 MWh
10366 MWh
11305 MWh
12290 MWh

Operating generators

IDTechnologyFuelMWStatus
NMP2Solar PhotovoltaicSUN2OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
58479
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right SEV NM Phase 2 power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at SEV NM Phase 2

Variation in the published months

Across 12 numeric monthly generation entries, 5 has the highest recorded value (419 MWh) and 12 the lowest (290 MWh). Their difference is 129 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
NMP2Solar Photovoltaic2.01.41.1Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check