Data last collected:
Dublin · Alameda · CA
Santa Rita Jail Hybrid
Operated by County of Alameda GSA
Published location
Where is Santa Rita Jail Hybrid?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
37.719167, -121.886944
Open the interactive map ↗Map data © OpenStreetMap contributors
Equipment mix
Operating capacity by technology
Grouped from this plant’s represented generator records. Use the CA plant index for regional peers.
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| SRFC2 | Other Natural Gas | NG | 1.4 | OP |
| SRPV2 | Solar Photovoltaic | SUN | 1 | OP |
| SRPV3 | Solar Photovoltaic | SUN | 0.5 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
Use this record
Questions this evidence can answer
Use the name, place, date and identifiers above to confirm that you have the right Santa Rita Jail Hybrid power plant: capacity and generation | PowerPlantFacts record.
Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.
Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.
A closer look at Santa Rita Jail Hybrid
Reading the MW column
In the 3 numeric rows displayed in this table, MW ranges from 0.5 (SRPV3) to 1.4 (SRFC2). The difference is 0.9 in the column's stated units. This summary covers the displayed rows and retains the table's period and scope.
Generator capacity in different operating conditions
| Generator ID | Technology | Nameplate MW | Summer MW | Winter MW | Minimum load MW |
|---|---|---|---|---|---|
| SRFC2 | Other Natural Gas | 1.4 | 1.4 | 1.4 | 1.4 |
| SRPV2 | Solar Photovoltaic | 1.0 | 1.0 | 1.0 | Not supplied |
| SRPV3 | Solar Photovoltaic | 0.5 | 0.5 | 0.1 | Not supplied |
EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.
Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.