Data last collected:
Wellsburg · Grundy · IA
Wellsburg Wind Project
Operated by MidAmerican Energy Co
Published location
Where is Wellsburg Wind Project?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
42.390833, -92.966667
Open the interactive map ↗Map data © OpenStreetMap contributors
Equipment mix
Operating capacity by technology
Grouped from this plant’s represented generator records. Use the IA plant index for regional peers.
See the evidence
Electricity output across the year
Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.
MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.
Read the chart as a table
| Record | MWh net generation |
|---|---|
| 1 | 38,023 |
| 2 | 46,620 |
| 3 | 58,275 |
| 4 | 58,393 |
| 5 | 35,969 |
| 6 | 36,616 |
| 7 | 14,498 |
| 8 | 20,736 |
| 9 | 27,396 |
| 10 | 53,515 |
| 11 | 43,285 |
| 12 | 35,400 |
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | 38,023 MWh |
| 2 | 46,620 MWh |
| 3 | 58,275 MWh |
| 4 | 58,393 MWh |
| 5 | 35,969 MWh |
| 6 | 36,616 MWh |
| 7 | 14,498 MWh |
| 8 | 20,736 MWh |
| 9 | 27,396 MWh |
| 10 | 53,515 MWh |
| 11 | 43,285 MWh |
| 12 | 35,400 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| WBWF | Onshore Wind Turbine | WND | 140.8 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
Use this record
Questions this evidence can answer
Use the name, place, date and identifiers above to confirm that you have the right Wellsburg Wind Project power plant: capacity and generation | PowerPlantFacts record.
Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.
Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.
A closer look at Wellsburg Wind Project
Variation in the published months
Across 12 numeric monthly generation entries, 4 has the highest recorded value (58,393 MWh) and 7 the lowest (14,498 MWh). Their difference is 43,895 MWh. Missing months have not been treated as zero.
Generator capacity in different operating conditions
| Generator ID | Technology | Nameplate MW | Summer MW | Winter MW | Minimum load MW |
|---|---|---|---|---|---|
| WBWF | Onshore Wind Turbine | 140.8 | 138.6 | 138.6 | 0.1 |
EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.
Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.