EIA plant 58918

Reedley · Fresno · CA

2081 Terzian Solar Project

Operated by Solarenewal LLC

Annual generation1,837 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is 2081 Terzian Solar Project?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

36.670000, -119.415833

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
178 MWh
2127 MWh
3173 MWh
4196 MWh
5227 MWh
6201 MWh
7189 MWh
8175 MWh
9153 MWh
10143 MWh
11100 MWh
1275 MWh

Operating generators

IDTechnologyFuelMWStatus
2081Solar PhotovoltaicSUN1.2OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
58918
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final