MWPowerPlantFacts

Data last collected:

EIA plant 58920

Merced · Merced · CA

2097 Helton Solar Project

Operated by Solarenewal LLC

Annual generation1,607 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is 2097 Helton Solar Project?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

37.352222, -120.506944

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic1.5 MW represented

Grouped from this plant’s represented generator records. Use the CA plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

170
2153
3153
4246
5288
6254
7172
890
955
1031
1129
1266

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
170
2153
3153
4246
5288
6254
7172
890
955
1031
1129
1266

2024 monthly net generation

MonthNet generation
170 MWh
2153 MWh
3153 MWh
4246 MWh
5288 MWh
6254 MWh
7172 MWh
890 MWh
955 MWh
1031 MWh
1129 MWh
1266 MWh

Operating generators

IDTechnologyFuelMWStatus
2097Solar PhotovoltaicSUN1.5OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
58920
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right 2097 Helton Solar Project power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at 2097 Helton Solar Project

Variation in the published months

Across 12 numeric monthly generation entries, 5 has the highest recorded value (288 MWh) and 11 the lowest (29 MWh). Their difference is 259 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
2097Solar Photovoltaic1.51.51.5Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check