PowerPlantFactsEvidence report · prepared 2 September 2026https://powerplantfacts.com/entity/58920
EIA plant 58920
Merced · Merced · CA
2097 Helton Solar Project
Operated by Solarenewal LLC
Published location
Where is 2097 Helton Solar Project?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
37.352222, -120.506944
Open the interactive map ↗Map data © OpenStreetMap contributors
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | 70 MWh |
| 2 | 153 MWh |
| 3 | 153 MWh |
| 4 | 246 MWh |
| 5 | 288 MWh |
| 6 | 254 MWh |
| 7 | 172 MWh |
| 8 | 90 MWh |
| 9 | 55 MWh |
| 10 | 31 MWh |
| 11 | 29 MWh |
| 12 | 66 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| 2097 | Solar Photovoltaic | SUN | 1.5 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
EIA plant ID
58920
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final