MWPowerPlantFacts
EIA plant 59095

Lancaster · Los Angeles · CA

Division 2

Operated by Tesla Inc.

Annual generation541 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is Division 2?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

34.708333, -118.130556

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
112 MWh
21 MWh
30 MWh
40 MWh
50 MWh
60 MWh
70 MWh
8115 MWh
9155 MWh
10100 MWh
1175 MWh
1283 MWh

Operating generators

IDTechnologyFuelMWStatus
GEN 1Solar PhotovoltaicSUN1OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
59095
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final