MWPowerPlantFacts

Data last collected:

EIA plant 59096

Lancaster · Los Angeles · CA

Division 3

Operated by Tesla Inc.

Annual generation458 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is Division 3?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

34.708333, -118.130556

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic1 MW represented

Grouped from this plant’s represented generator records. Use the CA plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

138
258
311
424
56
617
720
838
956
1057
1167
1266

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
138
258
311
424
56
617
720
838
956
1057
1167
1266

2024 monthly net generation

MonthNet generation
138 MWh
258 MWh
311 MWh
424 MWh
56 MWh
617 MWh
720 MWh
838 MWh
956 MWh
1057 MWh
1167 MWh
1266 MWh

Operating generators

IDTechnologyFuelMWStatus
GEN1Solar PhotovoltaicSUN1OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
59096
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Division 3 power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Division 3

Variation in the published months

Across 12 numeric monthly generation entries, 11 has the highest recorded value (67 MWh) and 5 the lowest (6 MWh). Their difference is 61 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
GEN1Solar Photovoltaic1.01.01.0Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check