MWPowerPlantFacts
EIA plant 59339

Gustine · Merced · CA

Quinto Solar PV Project

Operated by Arevon Energy, Inc.

Annual generation256,991 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is Quinto Solar PV Project?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

37.130278, -121.052222

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
18,840 MWh
210,671 MWh
319,100 MWh
426,239 MWh
533,382 MWh
634,453 MWh
731,120 MWh
830,878 MWh
925,645 MWh
1019,255 MWh
1113,141 MWh
124,267 MWh

Operating generators

IDTechnologyFuelMWStatus
SSC13Solar PhotovoltaicSUN108OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
59339
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final