PowerPlantFactsEvidence report · prepared 2 September 2026https://powerplantfacts.com/entity/59339
EIA plant 59339
Gustine · Merced · CA
Quinto Solar PV Project
Operated by Arevon Energy, Inc.
Published location
Where is Quinto Solar PV Project?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
37.130278, -121.052222
Open the interactive map ↗Map data © OpenStreetMap contributors
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | 8,840 MWh |
| 2 | 10,671 MWh |
| 3 | 19,100 MWh |
| 4 | 26,239 MWh |
| 5 | 33,382 MWh |
| 6 | 34,453 MWh |
| 7 | 31,120 MWh |
| 8 | 30,878 MWh |
| 9 | 25,645 MWh |
| 10 | 19,255 MWh |
| 11 | 13,141 MWh |
| 12 | 4,267 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| SSC13 | Solar Photovoltaic | SUN | 108 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
EIA plant ID
59339
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final