PowerPlantFactsEvidence report · prepared 2 September 2026https://powerplantfacts.com/entity/59396
EIA plant 59396
Billerica · Middlesex · MA
Shaffer
Operated by CD US Solar MT3, LLC
Published location
Where is Shaffer?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
42.594167, -71.249444
Open the interactive map ↗Map data © OpenStreetMap contributors
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | 175 MWh |
| 2 | 488 MWh |
| 3 | 534 MWh |
| 4 | 682 MWh |
| 5 | 693 MWh |
| 6 | 818 MWh |
| 7 | 704 MWh |
| 8 | 751 MWh |
| 9 | 549 MWh |
| 10 | 539 MWh |
| 11 | 474 MWh |
| 12 | 301 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| SHF01 | Solar Photovoltaic | SUN | 5 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
EIA plant ID
59396
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final