MWPowerPlantFacts

Data last collected:

EIA plant 59434

Indianapolis · Marion · IN

Duke Building 129

Operated by Concord New Energy

Annual generation4,417 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextMidcontinent Independent Transmission System Operator, Inc..Balancing authority or NERC region

Published location

Where is Duke Building 129?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

39.910833, -86.245278

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic3.4 MW represented

Grouped from this plant’s represented generator records. Use the IN plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

1121
2314
3435
4466
5545
6430
7447
8432
9439
10437
11188
12163

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
1121
2314
3435
4466
5545
6430
7447
8432
9439
10437
11188
12163

2024 monthly net generation

MonthNet generation
1121 MWh
2314 MWh
3435 MWh
4466 MWh
5545 MWh
6430 MWh
7447 MWh
8432 MWh
9439 MWh
10437 MWh
11188 MWh
12163 MWh

Operating generators

IDTechnologyFuelMWStatus
DU129Solar PhotovoltaicSUN3.4OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
59434
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Duke Building 129 power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Duke Building 129

Variation in the published months

Across 12 numeric monthly generation entries, 5 has the highest recorded value (545 MWh) and 1 the lowest (121 MWh). Their difference is 424 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
DU129Solar Photovoltaic3.43.43.4Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.