PowerPlantFactsEvidence report · prepared 2 September 2026https://powerplantfacts.com/entity/59655
EIA plant 59655
Pollock · Campbell · SD
Campbell County Wind Farm
Operated by Consolidated Edison Development Inc.
Published location
Where is Campbell County Wind Farm?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
45.753333, -100.275000
Open the interactive map ↗Map data © OpenStreetMap contributors
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | 20,506 MWh |
| 2 | 27,780 MWh |
| 3 | 33,951 MWh |
| 4 | 31,983 MWh |
| 5 | 23,923 MWh |
| 6 | 12,537 MWh |
| 7 | 17,472 MWh |
| 8 | 20,498 MWh |
| 9 | 22,495 MWh |
| 10 | 27,358 MWh |
| 11 | 22,988 MWh |
| 12 | 24,592 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| CCWF1 | Onshore Wind Turbine | WND | 94.3 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
EIA plant ID
59655
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final