PowerPlantFactsEvidence report · prepared 2 September 2026https://powerplantfacts.com/entity/59946
EIA plant 59946
Cedar City · Iron · UT
Granite Mountain Solar East, LLC
Operated by Clearway Renewable Operation & Maintenance LLC
Published location
Where is Granite Mountain Solar East, LLC?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
37.775090, -113.226403
Open the interactive map ↗Map data © OpenStreetMap contributors
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | 9,248 MWh |
| 2 | 11,373 MWh |
| 3 | 15,543 MWh |
| 4 | 21,286 MWh |
| 5 | 24,974 MWh |
| 6 | 25,361 MWh |
| 7 | 23,865 MWh |
| 8 | 22,589 MWh |
| 9 | 18,731 MWh |
| 10 | 15,803 MWh |
| 11 | 11,635 MWh |
| 12 | 10,571 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| GMSE | Solar Photovoltaic | SUN | 80 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
EIA plant ID
59946
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final