MWPowerPlantFacts

Data last collected:

EIA plant 60084

Valdosta · Lowndes · GA

PCA-Valdosta Mill

Operated by PCA-Valdosta Mill

Annual generation322,609 MWhSum of represented EIA-923 rows
Fuel codesWDS, BLQCodes retained from EIA records
Grid contextSouthern Company Services, Inc. - TransBalancing authority or NERC region

Published location

Where is PCA-Valdosta Mill?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

30.694444, -83.303056

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologyWood/Wood Waste Biomass69.9 MW represented

Grouped from this plant’s represented generator records. Use the GA plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

124,861.5
224,538.27
326,606.18
426,032.38
527,162.28
629,674.51
728,249.33
828,077
926,202.84
1025,883.34
1127,765.88
1227,555.37

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
124,861.5
224,538.27
326,606.18
426,032.38
527,162.28
629,674.51
728,249.33
828,077
926,202.84
1025,883.34
1127,765.88
1227,555.37

2024 monthly net generation

MonthNet generation
124,861 MWh
224,538 MWh
326,606 MWh
426,032 MWh
527,162 MWh
629,675 MWh
728,249 MWh
828,077 MWh
926,203 MWh
1025,883 MWh
1127,766 MWh
1227,555 MWh

Operating generators

IDTechnologyFuelMWStatus
TG3Wood/Wood Waste BiomassBLQ52.3OP
TG1Wood/Wood Waste BiomassWDS10.1OP
TG2Wood/Wood Waste BiomassWDS7.5OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
60084
Sector
Industrial CHP
Water source
Floridan Aquifer
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right PCA-Valdosta Mill power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at PCA-Valdosta Mill

Variation in the published months

Across 12 numeric monthly generation entries, 6 has the highest recorded value (29,675 MWh) and 2 the lowest (24,538 MWh). Their difference is 5,137 MWh. Missing months have not been treated as zero.

Reading the MW column

In the 3 numeric rows displayed in this table, MW ranges from 7.5 (TG2) to 52.3 (TG3). The difference is 44.8 in the column's stated units. This summary covers the displayed rows and retains the table's period and scope.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
TG1Wood/Wood Waste Biomass10.110.110.11.0
TG2Wood/Wood Waste Biomass7.57.57.51.0
TG3Wood/Wood Waste Biomass52.352.352.35.0

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check