MWPowerPlantFacts
EIA plant 60393

Shelby · Cleveland · NC

Warbler Holdings

Operated by SolRiver Capital LLC

Annual generation7,242 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextDuke Energy CarolinasBalancing authority or NERC region

Published location

Where is Warbler Holdings?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

35.318824, -81.623934

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
1443 MWh
2547 MWh
3583 MWh
4734 MWh
5648 MWh
6841 MWh
7739 MWh
8703 MWh
9743 MWh
10338 MWh
11486 MWh
12437 MWh

Operating generators

IDTechnologyFuelMWStatus
PV1Solar PhotovoltaicSUN4OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
60393
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final