MWPowerPlantFacts
EIA plant 60463

Cairo · Greene · NY

Greene County Meter #1

Operated by Tesla Inc.

Annual generation1,707 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextISO New England Inc.Balancing authority or NERC region

Published location

Where is Greene County Meter #1?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

42.294823, -74.000760

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
148 MWh
2180 MWh
3182 MWh
4191 MWh
5243 MWh
6242 MWh
7166 MWh
8196 MWh
9175 MWh
100 MWh
1122 MWh
1262 MWh

Operating generators

IDTechnologyFuelMWStatus
PV1Solar PhotovoltaicSUN1.6OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
60463
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final