EIA plant 60510

Hertford · Perquimans · NC

Two Mile Desert Project

Operated by Citizens Enterprises Corporation

Annual generation28,078 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextPJM Interconnection, LLCBalancing authority or NERC region

Published location

Where is Two Mile Desert Project?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

36.220000, -76.460000

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic16.2 MW represented

Grouped from this plant’s represented generator records. Use the NC plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

11,824
22,165
32,547
42,742
52,817
63,170
72,749
82,441
91,925
102,335
111,689
121,674

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
11,824
22,165
32,547
42,742
52,817
63,170
72,749
82,441
91,925
102,335
111,689
121,674

2024 monthly net generation

MonthNet generation
11,824 MWh
22,165 MWh
32,547 MWh
42,742 MWh
52,817 MWh
63,170 MWh
72,749 MWh
82,441 MWh
91,925 MWh
102,335 MWh
111,689 MWh
121,674 MWh

Operating generators

IDTechnologyFuelMWStatus
PV1Solar PhotovoltaicSUN16.2OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
60510
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Two Mile Desert Project power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Two Mile Desert Project

Variation in the published months

Across 12 numeric monthly generation entries, 6 has the highest recorded value (3,170 MWh) and 12 the lowest (1,674 MWh). Their difference is 1,496 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
PV1Solar Photovoltaic16.216.216.2Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check