MWPowerPlantFacts

Data last collected:

EIA plant 60607

Gordon · New London · CT

CMEEC - Polaris Park Solar Hybrid

Operated by Tesla Inc.

Annual generation4,971 MWhSum of represented EIA-923 rows
Fuel codesMWH, SUNCodes retained from EIA records
Grid contextISO New England Inc.Balancing authority or NERC region

Published location

Where is CMEEC - Polaris Park Solar Hybrid?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

41.381256, -72.076886

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic3.5 MW represented
TechnologyBatteries0.8 MW represented

Grouped from this plant’s represented generator records. Use the CT plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

1128
2292
3475
4452
5593
6563
7532
8553
9472
10470
11263
12178

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
1128
2292
3475
4452
5593
6563
7532
8553
9472
10470
11263
12178

2024 monthly net generation

MonthNet generation
1128 MWh
2292 MWh
3475 MWh
4452 MWh
5593 MWh
6563 MWh
7532 MWh
8553 MWh
9472 MWh
10470 MWh
11263 MWh
12178 MWh

Operating generators

IDTechnologyFuelMWStatus
PV1Solar PhotovoltaicSUN3.5OP
BA1BatteriesMWH0.8OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
60607
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right CMEEC - Polaris Park Solar Hybrid power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at CMEEC - Polaris Park Solar Hybrid

Variation in the published months

Across 12 numeric monthly generation entries, 5 has the highest recorded value (593 MWh) and 1 the lowest (128 MWh). Their difference is 465 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
BA1Batteries0.80.80.80.8
PV1Solar Photovoltaic3.53.53.5Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.