MWPowerPlantFacts

Data last collected:

EIA plant 60821

Layton · Davis · UT

Weber State University - Davis Campus PV

Operated by Tesla Inc.

Annual generation2,696 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextWestern Area Power Administration - Rocky Mountain RegionBalancing authority or NERC region

Published location

Where is Weber State University - Davis Campus PV?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

41.098957, -111.982167

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic1.3 MW represented

Grouped from this plant’s represented generator records. Use the UT plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

194
2144
3184
4252
5288
6311
7320
8302
9280
10247
11157
12117

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
194
2144
3184
4252
5288
6311
7320
8302
9280
10247
11157
12117

2024 monthly net generation

MonthNet generation
194 MWh
2144 MWh
3184 MWh
4252 MWh
5288 MWh
6311 MWh
7320 MWh
8302 MWh
9280 MWh
10247 MWh
11157 MWh
12117 MWh

Operating generators

IDTechnologyFuelMWStatus
PV1Solar PhotovoltaicSUN1.3OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
60821
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Weber State University - Davis Campus PV power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Weber State University - Davis Campus PV

Variation in the published months

Across 12 numeric monthly generation entries, 7 has the highest recorded value (320 MWh) and 1 the lowest (94 MWh). Their difference is 226 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
PV1Solar Photovoltaic1.31.31.3Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check