EIA plant 60906
Holyoke · Hampden · MA
Mt. Tom Solar Project Hybrid
Operated by Mt. Tom Solar, LLC
Published location
Where is Mt. Tom Solar Project Hybrid?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
42.268600, -72.603000
Open the interactive map ↗Map data © OpenStreetMap contributors
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | 108 MWh |
| 2 | 426 MWh |
| 3 | 440 MWh |
| 4 | 420 MWh |
| 5 | 505 MWh |
| 6 | 425 MWh |
| 7 | 201 MWh |
| 8 | 438 MWh |
| 9 | 346 MWh |
| 10 | 444 MWh |
| 11 | 272 MWh |
| 12 | 129 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| PV1 | Solar Photovoltaic | SUN | 4.5 | OP |
| BA1 | Batteries | MWH | 3.1 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
EIA plant ID
60906
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final