MWPowerPlantFacts
EIA plant 60966

Young America · Carver · MN

Lind Solar CSG

Operated by Terraform Arcadia

Annual generation7,632 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextMidcontinent Independent Transmission System Operator, Inc..Balancing authority or NERC region

Published location

Where is Lind Solar CSG?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

44.802355, -93.908719

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
1243 MWh
2410 MWh
3704 MWh
41,534 MWh
5176 MWh
6645 MWh
7941 MWh
8797 MWh
9934 MWh
10681 MWh
11374 MWh
12193 MWh

Operating generators

IDTechnologyFuelMWStatus
S0222Solar PhotovoltaicSUN4.9OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
60966
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final