MWPowerPlantFacts

Data last collected:

EIA plant 60991

Tatum · Lea · NM

Sterling I Wind Farm

Operated by AEM Wind LLC

Annual generation117,535 MWhSum of represented EIA-923 rows
Fuel codesWNDCodes retained from EIA records
Grid contextSouthwest Power PoolBalancing authority or NERC region

Published location

Where is Sterling I Wind Farm?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

33.359600, -103.250580

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologyOnshore Wind Turbine29.9 MW represented

Grouped from this plant’s represented generator records. Use the NM plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

19,340
212,146
312,019
412,272
511,546
68,730
76,879
86,841
97,926
1010,276
119,723
129,837

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
19,340
212,146
312,019
412,272
511,546
68,730
76,879
86,841
97,926
1010,276
119,723
129,837

2024 monthly net generation

MonthNet generation
19,340 MWh
212,146 MWh
312,019 MWh
412,272 MWh
511,546 MWh
68,730 MWh
76,879 MWh
86,841 MWh
97,926 MWh
1010,276 MWh
119,723 MWh
129,837 MWh

Operating generators

IDTechnologyFuelMWStatus
STER1Onshore Wind TurbineWND29.9OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
60991
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Sterling I Wind Farm power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Sterling I Wind Farm

Variation in the published months

Across 12 numeric monthly generation entries, 4 has the highest recorded value (12,272 MWh) and 8 the lowest (6,841 MWh). Their difference is 5,431 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
STER1Onshore Wind Turbine29.929.929.90.0

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check