PowerPlantFactsEvidence report · prepared 2 September 2026https://powerplantfacts.com/entity/61155
EIA plant 61155
Big Timber · Sweet Grass · MT
Big Timber Wind Farm
Operated by Consolidated Edison Development Inc.
Published location
Where is Big Timber Wind Farm?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
45.855428, -109.649167
Open the interactive map ↗Map data © OpenStreetMap contributors
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | 7,733 MWh |
| 2 | 7,234 MWh |
| 3 | 4,865 MWh |
| 4 | 6,847 MWh |
| 5 | 5,286 MWh |
| 6 | 2,500 MWh |
| 7 | 4,022 MWh |
| 8 | 3,579 MWh |
| 9 | 5,594 MWh |
| 10 | 5,725 MWh |
| 11 | 8,266 MWh |
| 12 | 10,518 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| BT-MT | Onshore Wind Turbine | WND | 25 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
EIA plant ID
61155
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final